En Route

5th June 2014

Today we arrived on site and the first job was to add the windows as we had reached their base/sill layer the previous day. The windows work with the same structure principle as the overall structure, a false arch; small arched/triangular windows so as not to weaken the building over, as observed in a similar building.  We then divided into groups, some people dug and transferred the last 4 loads of earth on to site, whilst others cut the stakes, finished the tyre roof structure and gradually as everyone finished their other jobs joined the team adding layers. As we finished for the day the sun was shinning and there was a momentous feeling that we were en route and now getting a bit nearer to completion.